![Engineered Flooring Installation](https://midwesthardwoodflooring.com/wp-content/uploads/2017/11/Engineered-floor-install5-1080x675.jpg)
Engineered Flooring Installation
Engineerd Flooring Installation
We Removed the old hardwood floor and installed new floating engineered wood floor over cork (for a soundproofing barrier).
This job also included removing carpeting and old base boards, as well as moving furniture. The entire project took 4 days. Every morning Marian and his assistant arrived ready to work. At the end of each day they cleaned up not only inside my condo, but also vacuumed the public corridor outside of my condo. Each day they also removed any debris. The maintenance guys in my building commented on what a good job they did, and how responsible they were.
All new baseboards were also installed throughout my condo. Marian paid great attention to detail, making sure that each aspect of the installation was completed in a way that would look the most professional. He offered to make improvements that were beyond what the job required. The finished results are beautiful and all that I had hoped for. It was a pleasure working with Marian, and I would recommend him without reservation.